Installing The Operation Panel; Routing The Connector Cord And Installing The Oil Stopper Plate - Brother LH4-B800E Instruction Manual

E series electronic lockstitch button holer
Hide thumbs Also See for LH4-B800E:
Table of Contents

Advertisement

4-9. Installing the operation panel

Top of work table
Top of work table
(3)
(5)
(6)
Bottom of work table
Bottom of work table
(3)
(6)

4-10. Routing the connector cord and installing the oil stopper plate

(3)
(2)
(4)
(1)
(2)
Table
(4)
(1)
Table
(2)
(5)
(1)
The operation panel can be installed to either the top
2057Q
or bottom of the work table.
1. Install the rear frame (1) to the work table (top or
bottom) with the four wood screws (2).
2. Install the front frame assy (3) to the rear frame
(1) with the four screws (4).
* The vertical orientation of the front frame assy
(3) is the same whether it is installed to the top
or the bottom of the work table.
* Pull the harnesses such as the ground harness
out of the way so that the operation panel side
cover (5) can be opened and closed.
3. Insert the connector cord (6) into the control box
through the hole at the side of the box.
2058Q
1. Gently tilt back the machine head.
2059Q
2. Pass the cords (1) through the hole in the work
table.
3. Install the oil stopper plate (2).
4. Move the connector cord (1) so that it will not be
clamped by the machine head and the bed base
(3), and then return the machine head to its
original position.
2060Q
HE-8000
4. INSTALLATION
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

He-8000

Table of Contents