Installing The Operation Panel; Connecting The Ground Wire - Brother BE-438C Instruction Manual

Electronic lockstitch button sewer
Hide thumbs Also See for BE-438C:
Table of Contents

Advertisement

3-10. Installing the operation panel

The operation panel can be installed to either the top or bottom of the work table.
Top of work table
2499Q
1. Install the rear frame (1) to the work table (top or bottom) with the four wood screws (2).
* At this time, tighten the wood screws (2) until the thickness of the rubber sheet is 2 to 2.5 mm.
2. Install the front frame (3) to the rear frame (1) with the four screws (4).
* The vertical orientation of the front frame (3) is the same whether it is installed to the top or the bottom of the work table.
3. Insert the connector cord (5) into the control box through the hole at the side of the box. Refer to "3-12. Connecting the
cords" for details on connecting the cord.
4. Secure the connector cord (5) with the staples (in three places).

3-11. Connecting the ground wire

Be sure to connect the ground. If the ground connection is not secure, you run the risk of receiving a serious electric
shock, and problems with correct operation may also occur.
2741Q
Bottom of work table
Table
2 - 2.5mm
CAUTION
Connect to the power switch. However, the
black wire is insulated to the inside of the box
and is not used.
Connect to ground
BE-438C
3. INSTALLATION
2500Q
Table
Rubber
sheet
0419Q
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents