Figure 52. Plugging In The Dc Terminal Block - Allied Telesis AT-EN646 Installation Manual

Enclosure and intelligent multiservice gateways
Table of Contents

Advertisement

Chapter 5: Installing the Gateway Indoors
ohm. If it is not, disconnect the power cable, repeat steps 8 through 11,
and re-test.
12. Plug the terminal block into the DC power socket, as shown in
Figure 52.
1175

Figure 52. Plugging in the DC Terminal Block

80
Section II: Indoor Installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-img646px-onAt-img646bd-on

Table of Contents

Save Article as PDF