Completing The Installation; Figure 44. Connecting The Lan Cables; Figure 45. Connecting The Management Cable - Allied Telesis AT-EN646 Installation Manual

Enclosure and intelligent multiservice gateways
Table of Contents

Advertisement

Completing the
Installation
Section I: Outdoor Installation
AT-iMG646xx Series Intelligent Multiservice Gateway and AT-EN646 Enclosure Installation Guide
3. Connect the LAN cables to the RJ-45 ports on the gateway, and
secure the wires with a wire tie, as shown in Figure 44.

Figure 44. Connecting the LAN Cables

4. Cut a notch into the bottom of the grommet to accommodate the LAN
cables and reinsert the grommet.
5. Trim the wire tie and seal the grommet with tape and silicone sealant.
To complete the installation, perform the following procedure:
1. Install an uninterruptible power supply according to the manufacturer's
instructions.
2. Plug the power cable from the gateway into the UPS.
3. Turn on the UPS.
4. If necessary, plug the management cable into the console port, as
shown in Figure 45.

Figure 45. Connecting the Management Cable

864
865
65