Perform Planned Failover (Template) - HP 418800-B21 - StorageWorks Modular Smart Array 70 Storage Enclosure Command Reference Manual

Job command reference
Hide thumbs Also See for 418800-B21 - StorageWorks Modular Smart Array 70 Storage Enclosure:
Table of Contents

Advertisement

Perform planned failover (template)

Template summary
Performs a failover of two sites in the case where the source site resources and link remain available.he
DR group pair contains one storage volume (virtual disk) at the source and destination sites.
A.
Stops an application on the enabled host at site 1 (if necessary).
B.
Unmounts the host volume on the enabled host at site 1.
C.
Performs a failover from site 1 to site 2.
D.
Discovers the host volume at site 2
E.
Mounts host volume on the enabled host at site 2.
F.
Starts applications on enabled host at site 2.
Guidelines apply.
Template options
Include e-mail notification. Adds a command for e-mail notification of the job instance status.
See SetNotificationPolicy.
Comments
Guidelines apply.
Example
This template was generated to perform one iteration of a planned failover of a DR group pair that
contains one virtual disk. No template option was selected.
46
Job concepts, templates and commands

Advertisement

Table of Contents
loading

Table of Contents