c O N c R E T E P A d A N d A R M A T T A c h M E N T
Concrete Anchors
1/2" x 3-1/2"
Above
Ground
Below the Frost
Line Check all
Local Codes
sample of standard Arm Attachment
Drawing not to scale
Post
25"
10"
Concrete Pad
6"
28"
Outside Property
inside Property
bracket height
using Standard Arm
Long Arm is
on Top of
Bracket!
27.5"
Bottom of CSW
Concrete Pad height
To AVOiD damaging operator, DO NOT
weld ANy supports to chassis. Chassis
MuST be allowed to flex during operation.
24"
(See next page for layout)
10
Top View of Chassis
19"
5-1/4"
3-7/8"
14"
3-5/8"
5-1/4"
Approximate placement of high
voltage and/or low voltage
conduits.
hinge Center
46"
2"
35.5"
11"
Long Arm
29.5"
Short Arm
24"
28"