Installation; Determine Location For Concrete Pad And Operator; Concrete Pad And Operator Attachment - Chamberlain LiftMaster Elite CSL24VH Installation Manual

Liftmaster elite series vehicular slide gate operator
Hide thumbs Also See for LiftMaster Elite CSL24VH:
Table of Contents

Advertisement

INSTALLATION

DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR

1
The gate operator should be installed near the front roller of the gate or near
the back of the gate (in the OPEN position). The space between the gate and the
output sprocket must be a minimum of 4 inches.
2
Lay out the concrete pad.

CONCRETE PAD AND OPERATOR ATTACHMENT

Check the national and local building codes before installation.
1
Install the electrical conduit.
2
Pour a concrete pad (reinforced concrete is recommended). The concrete pad
should be 6 inches above the ground and deeper than the frost line.
3
Attach the operator to the concrete pad with appropriate fasteners.
NOTE: An alternative to a concrete pad is to post mount the operator
(refer to accessories).
CONDUIT LOCATION
(Gate)
5-5/8"
1/2"
7"
1-1/4"
3-1/2" min.
2-1/4"
1-3/8"
(Conduit)
8"
4-1/2"
15"
24"
MOUNTING FOOTPRINT
11.9"
1-2" 2-3/4"
10.3"
2.85"
.63"
13"
23"
26"
14.6"
(Pad)
DETERMINE LOCATION FOR CONCRETE PAD AND OPERATOR +
CONCRETE PAD & OPERATOR ATTACHMENT
STANDARD INSTALLATION
4"(10 cm)
1
24" (61 cm)
REAR INSTALLATION
3
4 Concrete Anchors
1/2" x 3 1/2"
2
1
10.4"
14.1"
12
26"
(66 cm)
2
1
2
24"
(61 cm)
26"
(66 cm)
24"
(61 cm)
4" (10 cm)
26"
(66 cm)
Post Mount
6" Above Ground
Below the frost line.
Check all national and
local codes.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liftmaster elite csl24v

Table of Contents