Figure 7 Sliding the
ValueLoader into the
Rack Slot
Connecting the SCSI and Power Cables
Slide the ValueLoader onto the rails and secure the mounting
4
bracket to the rack using the screws and clip nuts from the
rackmount hardware package, as shown in
To connect the SCSI and power cables to the ValueLoader, follow
these steps:
Shut down and turn off the selected server. Turn off all
1
attached accessory devices, such as printers and other SCSI
devices. Remove the power cables from the server and all
attached accessories.
Failure to remove the power cables from these
Caution:
devices may result in damage to the
ValueLoader.