Veeder-Root Red Jacket Quick-Set Installation, Operation And Service page 32

4” submersible petroleum pump
Hide thumbs Also See for Red Jacket Quick-Set:

Advertisement

4" Standard Pump Installation, Operation & Service Manual
Wiring Three-Phase Tandem Pumps
Figure 23 shows the wiring schematic which allows both three-phase STPs to operate simultaneously with any
combination of dispensers turned on.
L1
X2
2 Pole
Relay
LEGEND
Overload
Normally
heater
closed
contact
153/3ptndmwir.eps
To Power Supply by Installer
L1
L2
L3
3
L2
3
2
4
1
L3
COIL
T1
T2
T3
Orange
Black
Red
To STP by Installer
(see diagram below)
Neutral of Power Supply
Normally
Screw
Wire added
open
terminal
by installer
contact
Figure 23. Suggested Wiring For Three-Phase Tandem Pumps
To Power Supply by Installer
L1
3
X2
T1
Orange
To STP by Installer
(see diagram below)
Dispenser Sw.
Conduit/contractors
box attached
to manifold
Wire added
by manufacturer
STP
27
Wiring Three-Phase Tandem Pumps
L1
L2
L3
3
L2
2
4
1
L3
COIL
T2
T3
Black
Red
230V
Electrical
interlock
Extractable
R
packer
O
G
Internal
overload
protectors
Motor