0.7 Location: electrical preinstallation requirements
Manusa
The assembly of a
1.
Power supply:
16 mm corrugated tube
3 x 1.5 mm2 cables (phase, neutral, earth)
Two-pole thermal-magnetic switch, min. 4A
2.
Radars:
Cables supplied with the accessory
3.
Program switch
16 mm corrugated tube
4 x 0.25 mm2 shield sleeve
0.8 Training requirements for fitters
Manusa
The installation of
technical personnel authorised by Manusa. The training process for authorised fitters takes the following objectives
into account:
To familiarise fitters with the use of maintenance and/or lifting equipment
The fitter must have knowledge on handling loads
To teach fitters how to use Personal Protective Equipment (PPE)
To teach fitters how to apply the provisions of the Low Voltage Directive
To impart solid technical knowledge about
0.9 Transport, storage, handling and packaging
0.9.1 Conditions de réception de la machine.
Manusa
performs the initial transport of the machine. Make sure that all the parts and components have arrived in
good condition: that they have not been tampered with, that no item is missing from the delivery note, that they have
not been wet or have been damaged by the environment. If not, you must reflect it in writing on the corresponding
transport delivery note and contact
0.9.2 Conditions of carriage
For subsequent transport, the following points must be taken into account:
The machine must always be properly packed.
The load must be fixed to the truck bed using the corresponding anchoring systems and load straps.
The machine must be covered and protected from the elements.
0.9.3 Storage conditions
If the machine is not to be installed immediately, it must be stored in a space that meets the following conditions:
Be a safe place, safe from impacts and out of the reach of people outside of work.
The machine must rest on a flat, smooth and resistant floor, keeping the same layout as in the vehicle or
transport container.
Protected against aggressive environments, inclement weather, humidity, oils, vapors, etc.
automatic door requires an electrical preinstallation comprising following elements:
machines and any maintenance, regulation, adjustment work, etc. must be carried out by
Manusa
Manusa
immediately.
products
Manusa / Instruction Manual
D01380EN-v5
7

Advertisement

loading
Need help?

Need help?

Do you have a question about the Operator Visio+ 100 and is the answer not in the manual?

Questions and answers

Related Products for Manusa Operator Visio+ 100