www.ti.com
4.2.4 Output Ripple
Figure 4-4
and
Figure 4-5
SLUUCZ1 – JULY 2024
Submit Document Feedback
show the output ripple waveforms at 0A and 17.5 A load.
Figure 4-4. Output Ripple With 0A Load
Figure 4-5. Output Ripple With 17.5 A Load
Copyright © 2024 Texas Instruments Incorporated
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Implementation Results
17
Telemetry Evaluation Module
Need help?
Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?