www.ti.com
5.2 EVM Assembly Drawing and PCB Layout
Figure 5-2
through
Figure 5-8
Figure 5-2. TPS546C25EVM-1PH Top Side Overlay
View (Top View)
Figure 5-4. TPS546C25EVM-1PH Internal Layer 1
(Top View)
SLUUCZ1 – JULY 2024
Submit Document Feedback
show the design of the TPS546C25EVM-1PH printed circuit board.
Copyright © 2024 Texas Instruments Incorporated
Figure 5-3. TPS546C25EVM-1PH Top Copper (Top
View)
Figure 5-5. TPS546C25EVM-1PH Internal Layer 2
(Top View)
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Hardware Design Files
21
Telemetry Evaluation Module
Need help?
Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?