Software
3.2.4 All Config
To set up the configurable parameter, sse the All Config tab
encoding.
10
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Telemetry Evaluation Module
(Figure
Figure 3-4. Configure – All Config
Copyright © 2024 Texas Instruments Incorporated
3-4), which also shows other details like Hex
Submit Document Feedback
www.ti.com
SLUUCZ1 – JULY 2024
Need help?
Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?