Software
3.2.2 Changing ON_OFF_CONFIG
Changing the On and Off Config prompts a pop-up window with details of the options shown in
This pop-up window shows multiple options of what turns on and off the power conversion. By default, the
TPS546C25 is configured to CONTROL Pin Only. This pin functions as the EN/UVLO pin with resistors.
8
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Telemetry Evaluation Module
Figure 3-2. Configure – ON_OFF_CONFIG
Copyright © 2024 Texas Instruments Incorporated
www.ti.com
Figure
3-2.
SLUUCZ1 – JULY 2024
Submit Document Feedback
Need help?
Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?