Download Print this page

Best Practices - Texas Instruments TPS546C25EVM-1PH User Manual

4v to 18v, 35a, buck converter with pmbus and telemetry evaluation module

Advertisement

Hardware

2.2 Best Practices

The following warnings and cautions are noted for the safety of anyone using or working close to the
TPS546C25EVM-1PH. Observe all safety precautions.
!
The circuit module has signal traces, components, and component leads on the bottom of the board.
This can result in exposed voltages, hot surfaces, and sharp edges. Do not reach under the board
during operation.
External Connections: All external connections to the hardware must stay within the recommended
operating conditions and intended usage for all hardware/components connected in the system.
The circuit module can be damaged by over temperature. To avoid damage, monitor the temperature
during evaluation and provide cooling.
Some power supplies can be damaged by application of external voltages. If using more than
one power supply, check your equipment requirements and use blocking diodes or other isolation
techniques, to prevent damage to the equipment.
The communication interface is not isolated on the EVM. Make sure that there is no ground potential
between the computer and the EVM. Be aware that the computer is referenced to the battery
potential of the EVM.
6
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Telemetry Evaluation Module
Hot surface. Contact can cause burns. Do not touch! TPS546C25EVM-1PH
circuit module can become hot during operation due to dissipation of heat. Avoid
Caution
contact with the board. Follow all applicable safety procedures applicable to your
laboratory.
Caution
Do not leave the EVM powered when unattended.
WARNING
WARNING
CAUTION
CAUTION
CAUTION
Copyright © 2024 Texas Instruments Incorporated
www.ti.com
SLUUCZ1 – JULY 2024
Submit Document Feedback

Advertisement

loading
Need help?

Need help?

Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?

Subscribe to Our Youtube Channel