www.ti.com
5.3 Bill of Materials
Table 5-1
lists the bill of materials for the TPS546C25EVM-1PH.
(1)
Designator
Quantity
!PCB1
BOOT1, TP8, VOSNS1
C1, C2
C3, C4, C5, C22, C23, C24, C26
C6, C20, C25
C7, C8, C9, C10, C13, C14, C15, C16,
C17, C18, C19, C21, C29, C30, C31,
C32, C33, C34, C36, C40
C11, C12, C35, C38, C39
C27
C28
C41, C42
C43, C44
C45
D1
FB1, TP15
FID1, FID2, FID3, FID4, FID5, FID6
H1, H2, H3, H4
J1, J5, J13
J2, J4
J3
J6
J7, J10
J8
J9, J15
J11
J12
J14
L2
SLUUCZ1 – JULY 2024
Submit Document Feedback
Table 5-1. TPS546C25EVM-1PH Bill of Materials
Value
Description
1
Printed Circuit Board
3
Test Point, Miniature, Red, TH
2
10uF
CAP, CERM, 10uF, 6.3V, +/- 20%, X5R, 0603
7
10uF
CAP, CERM, 10uF, 25V, +/- 10%, X7R, 0805
3
0.1uF
CAP, CERM, 0.1uF, 25V, +/- 10%, X7R, 0402
20
47uF
CAP, CERM, 47uF, 6.3V, +/- 20%, X5R, AEC-Q200
Grade 3, 0805
5
390µF
390µF 2.5V Aluminum - Polymer Capacitors 2917
(7343 Metric) 9mOhm 3000 Hrs @ 125°C
1
270µF
270uF 35V Polymer ALUM Electrolytic Capacitor, CR
Series 4000h 10.3x10.3x9.9mm
1
1uF
CAP, CERM, 1uF, 16V, +/- 10%, X6S, 0402
2
2.2uF
CAP, CERM, 2.2µF, 10V,+/- 10%, X7S, AEC-Q200
Grade 1, 0402
2
10pF
CAP, CERM, 10pF, 50V, +/- 5%, C0G/NP0, 0402
1
220pF
CAP, CERM, 220pF, 50V, +/- 5%, C0G/NP0, 0603
1
Green
LED, Green, SMD
2
Test Point, Miniature, Yellow, TH
6
Fiducial mark. There is nothing to buy or mount.
4
Bumpon, Hemisphere, 0.44 × 0.20, Clear
3
Header, 2.54mm, 2x1, Gold, TH
2
Therminal Block, 5mm, 2-pole, Tin, TH
1
Terminal Block, 60A, 10.16mm Pitch, 2-Pos, TH
1
Header, 2.54mm, 2x2, Gold, TH
2
Card Edge Socket, 0.8mm, 10x2, SMT
1
Header, 2.54mm, 12x2, Gold, TH
2
Header, 2.54mm, 4x2, Gold, TH
1
Header, 100mil, 7x2, Gold, TH
1
Header (shrouded), 100mil, 5x2, Gold, TH
1
1mm Uninsulated Shorting Plug, 10.16mm spacing, TH Shorting Plug, 10.16mm
1
120nH
Inductor, Shielded, Ferrite, 120nH, 35.5A, 0.000228
ohm, SMD
Copyright © 2024 Texas Instruments Incorporated
Package
Red Miniature Testpoint
603
805
402
805
2917
SMT_ECAP_10MM3_10M
M3
402
402
402
603
LED_0603
Yellow Miniature Testpoint
N/A
Transparent Bumpon
Header, 2.54mm, 2x1, TH
TH, 2-Leads, Body
10x10mm, Pitch 5mm
21.8x30x19 mm
Header, 2.54mm, 2x2, TH
Card Edge Socket,
0.8mm, 10x2, SMT
Header, 2.54mm, 12x2,
TH
Header, 2.54mm, 4x2, TH
7x2 Header
5x2 Shrouded header
spacing, TH
10.8x7.2x7.5mm
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and Telemetry Evaluation Module
Hardware Design Files
Part Number
Manufacturer
SR008
Any
5000
Keystone Electronics
GRM188R60J106ME47D
MuRata
GRM21BZ71E106KE15L
MuRata
GRM155R71E104KE14D
MuRata
GRT21BR60J476ME13L
MuRata
EEF-JX0E391RE
Panasonic
PCR1V271MCL1GS
Nichicon
C1005X6S1C105K050BC
TDK
GRT155C71A225KE13
MuRata
8.85012E+11
Wurth Elektronik
C0603C221J5GACTU
Kemet
150060GS75000
Wurth Elektronik
5004
Keystone Electronics
N/A
N/A
SJ-5303 (CLEAR)
3M
TSW-102-08-G-S
Samtec
282856-2
TE Connectivity
399100102
Molex
PBC02DAAN
Sullins Connector
Solutions
HSEC8-110-01-S-DV-A
Samtec
TSW-112-08-G-D
Samtec
TSW-104-08-L-D
Samtec
TSW-107-07-G-D
Samtec
5103308-1
TE Connectivity
D3082-05
Harwin
SLC1175-121MEB
Coilcraft
23
Need help?
Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?