Table 2-2
lists the EVM jumpers.
Jumper
Type
J5
Header, 2.54mm, 2x1, Gold, TH
J8
Header, 2.54mm, 12x2, Gold, TH
J9
Header, 2.54mm, 4x2, Gold, TH
J11
Header, 100mil, 7x2, Gold, TH
J13
Header, 2.54mm, 2x1, Gold, TH
J15
Header, 2.54mm, 4x2, Gold, TH
Table 2-3
lists the options for the EN/UVLO pin selections on J6.
Shunt Position
Pin 1 to 2 shorted
Pin 3 to 4 shorted
Table 2-4
lists the EVM connector functions.
Connector
J1
Header, 2.54mm, 2x1, Gold, TH
J2
Terminal Block, 5mm, 2-pole, Tin, TH
J3
Terminal Block, 60A, 10.16mm Pitch,
2-Pos, TH
J4
Terminal Block, 5mm, 2-pole, Tin, TH
J7
Card Edge Socket, 0.8mm, 10x2, SMT
J10
Card Edge Socket, 0.8mm, 10x2, SMT
J12
Header (shrouded), 100mil, 5x2, Gold,
TH
J14
1mm Uninsulated Shorting Plug,
10.16mm spacing, TH
2.1.5 Configuring EVM to Overdrive VDRV
The EVM has a terminal connection J4 that is used to overdrive the VDRV. The output of the internal regulator is
set for 4.5V by default. Using the external supply is useful to minimize the power dissipation in the TPS546C25
IC when operating at high switching frequency. Overdriving the VDRV moves the loss from the internal regulator
of the TPS546C25 to the external supply. To use the external supply, follow the steps on the EVM as follows:
1. Connect external supply to J4 and set external supply to between 4.5V to 5.5V.
2. Power up the external supply to overdrive VDRV, then power up PVIN .
SLUUCZ1 – JULY 2024
Submit Document Feedback
Table 2-2. Jumpers
Name
PG_PULLUP
MSEL2
MSEL1
VSEL
RESET
ADDR
Table 2-3. J6 Selections
PMBus adapter control signal
Resistor divider to PVIN default pins 3-4 shorted
Table 2-4. Connector Functions
Type
Name
VOUT
VIN
VOUT
EXTBIAS
VOUT
VOUT
USB2GPIO
PGND
Copyright © 2024 Texas Instruments Incorporated
Connect RESET to pullup resistor default pins 1-2
shorted
Jumper for setting MSEL2 default pins 5-6 shorted
Jumper for setting MSEL1 default pins 3-4 shorted
Jumper for setting VSEL default pins 7-8 shorted
Connect RESET to pullup resistor default pins 1-2 open
Jumper for setting ADDR default pins 1-2 shorted
Selection
Description
Connect for differential probe with 100mil spacing
Connection for input voltage source. Maximum current rating =
24A
Connection for load, maximum current rating = 50A
Connection for external bias supply
Connection for miniSlammer
Connection for miniSlammer
Connection for USB2GPIO2
Ground connection
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Hardware
Description
Telemetry Evaluation Module
5

Advertisement

loading
Need help?

Need help?

Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?