www.ti.com
3.2.7 Status
Selecting the Status screen from the lower left corner
SLUUCZ1 – JULY 2024
Submit Document Feedback
(Figure
3-7) shows the status of the device.
Figure 3-7. Status Screen
TPS546C25EVM-1PH 4V to 18V, 35A, Buck Converter with PMBus and
Copyright © 2024 Texas Instruments Incorporated
Software
13
Telemetry Evaluation Module
Need help?
Do you have a question about the TPS546C25EVM-1PH and is the answer not in the manual?