Motor housing support fixture .................................26 12.9.2 Stator alignment ring ..................................27 12.9.3 Stator inserting tool ..................................28 12.9.4 Terminal block hand press tool ...............................29 12.9.5 Pressure test tool ...................................30 XFP Pump Wiring (TI-411) ................................31 ABS reserves the right to alter specifications due to technical developments...
The ABS units are prepared for transportation by placing them on an adequately strong horizontal surface. Care should be taken that they cannot fall over. The hoist must be adequately dimensioned for the total weight of the ABS units (incl. all accessories which may be fitted) and must comply with...
Do not stay or work in the swivel area of a suspended load. The lifting hook height must take into consideration the height of the ABS units as well as the length of the lifting chain.
Workshop Manual ABS submersible sewage pump XFP 80C - 150E General design features XFP is a submersible sewage and wastewater pump with a premium efficiency motor. The water-pressure-tight, encapsulated, fully flood-proof motor and the pump section form a compact, robust, modular construction.
Workshop Manual ABS submersible sewage pump XFP 80C - 150E Hydraulics - Removal and Refitting Removing Impeller. Remove screws (150) to release volute (149) from motor housing (55). Shaft Connect hoist to lifting hoop, lift motor housing assembly from volute and lay securely on its side on workbench.
Workshop Manual ABS submersible sewage pump XFP 80C - 150E Mechanical Seals - Removal and Fitting Lower seal (hydraulic side) Removal Remove volute, bottom plate and impeller (see page 8). Note: drain oil from oil chamber before removal of the mechanical seal (see page 14).
10 Workshop Manual ABS submersible sewage pump XFP 80C - 150E Upper seal (motor side) Removal Remove volute, bottom plate and impeller (see page 8). Note: drain oil from oil chamber and motor chamber be- fore removal of the upper mechanical seal (see page 14).
Workshop Manual ABS submersible sewage pump XFP 80C - 150E Bearings - Removal and Fitting Bearing assembly removal Remove volute, bottom plate, impeller and mechanical seals (see pages 8, 9 & 10). Note: drain oil from oil chamber and motor chamber before removal of the mechanical seals (see page 14).
Workshop Manual ABS submersible sewage pump XFP 80C - 150E Stator - Removal and Fitting alignment circlip terminal block Fig 7. Terminal block and circlip fitting Check that O-ring (46) is correctly fitted in motor housing bearing bore. Fit stator alignment ring (Sec 12.9.2) into motor housing.
14 Workshop Manual ABS submersible sewage pump XFP 80C - 150E Oil Drain and Fill 10.1 Oil chamber Drain Loosen plug screw (74) enough to release pressure (see Health and Safety Instructions page 3). Plug Place pump in horizontal position, sitting on discharge flange, with screw motor housing supported from underneath.
16 Workshop Manual ABS submersible sewage pump XFP 80C - 150E Test Procedures High voltage test A high voltage test is recommended, if the pump has been repaired or reassembled, to detect any breakdown of insulation. Link all power leads together and apply a high voltage between earth and power leads as follows:...
4 Workshop Manual ABS submersible sewage pump XFP 80C - 150E 1.8 Stator extraction tool Material: MILD STEEL Dimensions in mm Notes: Part no. 2 is a hollow hydraulic cylinder HSS 106 for connection to a hydraulic hand pump. Before applying hydraulic pressure, engage the disc tool into position against the stator core by tightening the adjusting nut (1).