www.ti.com
3
Introduction
The TS3DDR4000-EVM is an evaluation module for TI's 12-bit, 1:2 high-speed DDR3/DDR3/DDR4
switch/multiplexer. The EVM allows for easy evaluation of the control inputs and connectivity. This EVM is
not designed for high speed signal integrity evaluation.
3.1
List of Hardware Items for Operation
The following items are required for EVM evaluation:
•
TS3DDR4000-EVM
•
Power Supply
Figure 1
illustrates the TS3DDR4000-EVM board.
SLVUAE8 – February 2015
Submit Documentation Feedback
Figure 1. TS3DDR4000-EVM
Copyright © 2015, Texas Instruments Incorporated
Introduction
TS3DDR4000 EVM User's Guide
3
Need help?
Do you have a question about the TS3DDR4000 EVM and is the answer not in the manual?
Questions and answers