About this Manual
1
About this Manual
This user's guide describes the TS3DDR4000 evaluation module (EVM) and its intended use. This guide
contains the EVM schematics, bill of materials, and board layer information.
2
Information About Cautions and Warnings
The information in a caution or a warning is provided for personal protection. Read each caution and
warning carefully.
This EVM contains components that can potentially be damaged by
electrostatic discharge. Always transport and store the EVM in its supplied ESD
bag when not in use. Handle using an antistatic wristband. Operate on an
antistatic work surface. For more information on proper handling, see the
Electrostatic Discharge (ESD) application note (SSYA008).
2
TS3DDR4000 EVM User's Guide
ATTENTION
STATIC SENSITIVE DEVICES
HANDLE ONLY AT
STATIC SAFE WORK STATIONS
CAUTION
Copyright © 2015, Texas Instruments Incorporated
www.ti.com
SLVUAE8 – February 2015
Submit Documentation Feedback
Need help?
Do you have a question about the TS3DDR4000 EVM and is the answer not in the manual?