Power
The TS3DDR4000 EVM requires an external supply to operate. When powered, the power consumption of
the board will be less than 10 mA. When power is connected, the power indicator LED D1 will be lit.
4.3
Select and Enable Jumper Operation
Jumpers J1, J2, and J3 provide an easy means of selecting a high or low input to these. Using included
jumpers with the EVM, short pins 1 and 2 to connect the pin to VDD. Short pins 2 and 3 to connect the pin
to ground.
Table 1
SLVUAE8 – February 2015
Submit Documentation Feedback
VDD
TP1
TP2
Figure 4. VDD Input and Indicator Diode
Ground test points
Figure 5. Ground Test Points
contains the logic control information for the select and enable lines.
Figure 6. SEL0, SEL1, /EN Jumpers
Copyright © 2015, Texas Instruments Incorporated
TS3DDR4000-EVM Connections Overview
VDD
D1
Green
R1
220
GND
TP3
TP4
TP5
TP6
GND
J1
VDD
1
SEL0
2
3
GND
J2
VDD
1
/EN
2
3
GND
J3
VDD
1
SEL1
2
3
GND
TS3DDR4000 EVM User's Guide
5
Need help?
Do you have a question about the TS3DDR4000 EVM and is the answer not in the manual?