Confirming Ladder Program Operation - Omron ZEN Operation Manual

Programmable relay
Hide thumbs Also See for ZEN:
Table of Contents

Advertisement

Confirming Ladder Program Operation

3-4

Confirming Ladder Program Operation

Precautions for Safe Use
Procedure for Checking Operation
Checks Before Turning ON the Power
Operation Checks
Method for Checking Operation
Always check the ladder program operation before using the ZEN.
• Before turning ON the power, check that all wiring has been
performed correctly.
• For systems with loads connected to the outputs that may cause
serious injury or damage to equipment if operation is incorrect,
remove the output wiring before performing trial operation.
• Always ensure safety in the vicinity before switching the
operating mode (RUN/STOP).
1.
Check that the ZEN is mounted and wired correctly.
2.
Check that the operation of the ZEN will not have a negative
impact on the system. Check for any dangers.
3.
Turn ON the power supply to the ZEN.
The ZEN will start in RUN Mode when power is turned ON.
4.
Turn each input ON and OFF and check that the program is
operating correctly.
5.
Adjust any problems.
• Check the operation by the flashing input and output displays on
the Main Screen (not including LED-type CPU Units).
• Check the operation by using the Ladder Program Monitor (not
including LED-type CPU Units).
• Connect the ZEN Support Software and check operation using
the monitor function. Refer to the operation manual for the ZEN
Support Software.
Section 3-4
69

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents