THE 3-POINT HITCH SETUP
(1) Top link mounting hole 1
(2) Top link mounting hole 2
3. Drawbar
Remove the drawbar if a close-mounted implement is
attached.
4. Lifting rod (right)
1. Loosen the lock nut.
[ROPS model]
(1) Lock nut
[CAB model]
(1) Lock nut
2. Put the 3-point mounted implement on the ground.
LX2620,LX2620SU
3-POINT HITCH AND DRAWBAR
3. Adjust the height of the lifting rod by turning it with
the adjusting handle until the 3-point mounted
implement is level.
[ROPS model]
(1) Adjusting handle
[CAB model]
(1) Adjusting handle
4. Shorten or lengthen the adjustable lifting rod.
5. After adjustment, tighten the lock nut securely.
5. Top link
1. Adjust the angle of the implement to the desired
position by shortening or lengthening the top link.
2. The proper length of the top link varies according to
the type of implement being used.
6. Telescopic stabilizers
1. Adjust the telescopic stabilizers to control horizontal
sway of the implement.
Select the proper set of holes.
(See Hydraulic control unit reference chart on page
79.)
71