Initial Start-Up; Installation Of A Rotor - Sigma 2-16K Operating Manual

Table of Contents

Advertisement

3.4

Initial Start-Up

Attention!
Before initial start-up please take care that your centrifuge is orderly installed
(refer to chapter 3.2 "Installation").
3.4.1
Switching on of the Centrifuge
Press mains switch (on the right side panel).
− The centrifuge display is illuminated.
3.4.2
Opening of the Lid
Press the lid-key.
− The lid opens.
3.4.3

Installation of a Rotor

Put a rotor onto the shaft and fasten it by screwing the rotor tie-down screw
clockwise onto the drive shaft. Please use the supplied rotor wrench (refer to
chapter 3.3 "Installation of rotors and accessories").
Operating Manual SIGMA 2-16K, page 31 of 61
03/06

Advertisement

Table of Contents
loading

This manual is also suitable for:

2-16 kc2-16 kch10160101611016210167 ... Show all

Table of Contents