Installing the Blower Assembly

Parts needed for this procedure:
1
Blower assembly (from the Blower and Drive Kit)
1
Spring (from the Blower and Drive Kit)
Procedure
WARNING
An uncovered discharge opening could allow the
lawn mower to throw objects at you or bystanders,
resulting in serious injury. Also, contact with the
blade could occur.
• Never operate the lawn mower unless you install
a cover plate, a mulch plate, or a grass chute and
catcher.
• Make sure that the grass deflector is installed
when you remove the grass chute and catcher.
1. Remove the side-discharge chute from the mower deck
(Figure
15).
Note: Save all the hardware and the side-discharge
chute. Install the side-discharge chute when the bagger
and blower are removed.
Figure 15
1. Bolt
2. Spacer
3. Locknut
4. Spring
5. Spring installed
6. Grass deflector
7. L-end of spring (Place
it behind the deck edge
before installing the bolt)
8. J-hook end of the spring
2. Slide the blower-assembly peg into the pivot hole
(Figure 16
or
Figure
48- and 52-inch mower deck shown
1. Blower assembly
2. Mower deck
60- and 72-inch mower deck shown
1. Blower assembly
2. Mower deck
14
17).
Figure 16
3. Pivot hole
4. Blower-assembly peg
Figure 17
3. Pivot hole
4. Blower-assembly peg

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-z vac 78567E-z vac 78568

Table of Contents