Toro E-Z Vac 78566 Operator's Manual page 18

48in, 52in, 60in or 72in dfs collection system
Table of Contents

Advertisement

Figure 26
60- and 72-inch bagger shown
1. Blower assembly
2. Lower tube
3. Latch
9. Using the 3 holes or indentations in the upper tube as a
template, drill 3 holes (7/32 inch diameter) where the
upper and lower tubes join together
1. Bagger hood
2. Upper tube
3. Drill 7/32 inch diameter
holes here (use the upper
tube as a template)
10. Remove the lower tube from the blower.
18
(Figure
Figure 27
4. Lower tube
5. Blower assembly
27).

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-z vac 78567E-z vac 78568

Table of Contents