Setup - Toro E-Z Vac 78566 Operator's Manual

48in, 52in, 60in or 72in dfs collection system
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
9
10
11
Description
No parts required
Left bumper
Right bumper
Carriage bolt (3/8 x 1-1/4 inches)
Flange nut (large flange–3/8 inch)
Upper mounting bracket
Lower mounting bracket
Carriage bolt (3/8 x 1-1/4 inches)
Carriage bolt (1/2 x 2–1/2 inches)
Flange nut (large flange–3/8 inch)
Flange nut (1/2 inch)
Handle assembly
Handle bracket
Carriage bolt (3/8 x 1-1/4 inches)
Clevis-pin spring
Flange nut (large flange–3/8 inch)
Hood assembly
Knob
Carriage bolt
Bagger assembly
Pin and hairpin cotter assembly
Muffler deflector
Flange nut (small flange–3/8 inch)
Carriage bolt (3/8 x 1-1/4 inches)
Blower belt (from the Blower and Drive
Kit)
Blower assembly (from the Blower and
Drive Kit)
Spring (from the Blower and Drive Kit)
Upper tube
Lower tube
Bolt (#10 x 3/4 inches)
Locknut (#10)
Washer (7/32 inch)
Belt cover (from the Blower and Drive
Kit)
Qty.
Prepare the mower.
1
1
Install the side bumpers.
2
6
1
1
4
Install the bagger mounting brackets.
2
4
2
1
1
Install the handle assembly (for 60- and
4
72-inch mowers).
1
4
1
1
Install the hood assembly.
1
1
Install the bagger assembly.
2
1
2
Install the muffler deflector.
2
Route the blower belt into the blower
1
assembly.
1
Install the blower assembly.
1
1
1
3
Install the discharge tubes.
3
3
1
Install the belt cover.
6
Use

Advertisement

Table of Contents
loading

This manual is also suitable for:

E-z vac 78567E-z vac 78568

Table of Contents