Equipment Grounding (Gnd) - Fronius Primo GEN24 208-240 Operating Instructions Manual

Hide thumbs Also See for Primo GEN24 208-240:
Table of Contents

Advertisement

IMPORTANT!
Very high start-up currents can temporarily distort or interrupt the output
voltage. Simultaneous operation of electronic devices in the same backup power
grid should be avoided.
IMPORTANT!
The inverter may only be operated within the limits of its technical capabilities.
Operation outside of its technical capabilities can cause the inverter to shut
down.
Equipment
Grounding a point in the device, system, or installation serves as a protective
grounding (GND)
measure against electric shock in the event of a fault. When installing an inverter
from safety class 1 (see
quired.
When connecting the ground conductor, ensure that it is secured to prevent un-
intentional disconnection. All of the points listed in the chapter headed
necting the inverter to the public grid (AC side)
When using strain-relief devices, it is important to ensure that the ground con-
ductor is loaded last in the event of a failure. The respective national standards
and regulations and requirements for minimum cross-section must be observed
when connecting the ground conductor.
Technical
data), a ground conductor connection is re-
49
on page
must be observed.
Con-
9

Advertisement

Table of Contents
loading

Table of Contents