Load Management - Fronius Primo GEN24 208-240 Operating Instructions Manual

Hide thumbs Also See for Primo GEN24 208-240:
Table of Contents

Advertisement

Load management

Load manage-
"Rules"
ment
It is possible for up to four different load management rules to be defined. At
the same threshold values, the rules are activated in succession. For deactiva-
tion, this is done in reverse; the I/O last switched on is the first to be switched
off. In the case of different thresholds, the I/O with the lowest threshold is
switched on first, followed by the second lowest, and so on.
IMPORTANT!
An I/O is activated/deactivated after 60 seconds.
"Load"
-
-
-
"Thresholds"
-
-
"Runtimes"
-
-
-
78
Control is
"Off"
(deactivated).
Control is effected by the
Control is effected by
only be selected if a meter has been connected. Control is effected using the
actual power of feeding in with respect to the grid.
"On": For entering an effective power limit, at which the output is activated.
"Off": For entering an effective power limit, at which the output is deactiv-
ated.
Field for activating the
the output is to be activated for each switch-on process.
Field for activating the
Field for activating the
ated in total per day (several switch-on processes are allowed for).
"Power
generated".
"Excess power"
(with feed-in limits). This option can
"Minimum runtime per switch-on process"
"Maximum runtime per
"Target runtime"
for which the output is to be activ-
for which
day".

Advertisement

Table of Contents
loading

Table of Contents