can be set here. Devices having higher priority are actuated first, and subsequently, if
there is still excess energy available, the other devices.

Load management

It is possible for up to four different load management rules to be defined. At the same
threshold values, the rules are activated in succession. For deactivation, this is done in
reverse; the I/O last switched on is the first to be switched off. In the case of different
thresholds, the I/O with the lowest threshold is switched on first, followed by the second
lowest, and so on.
I/Os controlled by the produced power are always prioritised over a battery and Ohmpi-
lot. That is to say that an I/O can switch on and result in the battery no longer being
charged or the Ohmpilot no longer being activated.
An I/O is activated or deactivated only after 60 seconds.
Control
-
-
-
Thresholds
-
-
Runtimes
-
-
-
98
Control is deactivated.
Control is effected by the power generated.
Control is effected by excess power (given feed limits). This option can only be
selected if a meter has been connected. Control via Energy Manager is effected
using the actual power of feeding in with respect to the grid.
On: For entering an effective power limit, at which the output is activated.
Off: For entering an effective power limit, at which the output is deactivated.
Field for enabling a minimum duration for which the output is to be activated for each
switch-on process.
Field for enabling the maximum runtime per day.
Field for enabling a target duration for which the output is to be activated in total per
day (total of several switch-on processes).