Planet IGS-4215-4P4T Quick Installation Manual

Industrial l2/l4 managed gigabit switch with 4-/8-/16-port 802.3at poe+
Hide thumbs Also See for IGS-4215-4P4T:

Advertisement

Industrial L2/L4 Managed Gigabit Switch
with 4-/8-/16-Port 802.3at PoE+
IGS-4215-4P4T
IGS-4215-4P4T2S
IGS-4215-8P2T2S
IGS-4215-16P2T2S
Industrial L2/L4 Managed Gigabit Switch
with 4-/8-Port 802.3bt PoE++
IGS-4215-4UP4T2S
IGS-4215-8UP2T2S
Quick Installation Guide
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IGS-4215-4P4T and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Planet IGS-4215-4P4T

  • Page 1 Industrial L2/L4 Managed Gigabit Switch with 4-/8-/16-Port 802.3at PoE+ IGS-4215-4P4T IGS-4215-4P4T2S IGS-4215-8P2T2S IGS-4215-16P2T2S Industrial L2/L4 Managed Gigabit Switch with 4-/8-Port 802.3bt PoE++ IGS-4215-4UP4T2S IGS-4215-8UP2T2S Quick Installation Guide...
  • Page 2: Table Of Contents

    3. WIRING THE POWER INPUTS ..........5   4. TERMINAL SETUP ..............10   5. STARTING WEB MANAGEMENT ........... 18   6. RECOVERING BACK TO DEFAULT CONFIGURATION ..25   7. CUSTOMER SUPPORT ............27   - 2 - PLANET Technology Corp.2024©...
  • Page 3: Package Contents

    Quick Installation Guide 1. Package Contents Thank you for purchasing PLANET L2/L4 Managed Gigabit Switch. The descriptions of these models are shown below: Industrial 4-Port 10/100/1000T 802.3at PoE + 4-Port IGS-4215-4P4T 10/100/1000T Managed Switch Industrial 4-Port 10/100/1000T 802.3at PoE + 4-Port...
  • Page 4 Quick Installation Guide DIN-rail Kit x 1  Wall Mounting Kit x 1  If any item is found missing or damaged, please contact your local reseller for replacement. - 4 - PLANET Technology Corp.2024©...
  • Page 5: Requirements

    Web interface of the Industrial Managed PoE+ Switch is not accessible, please turn off the anti-virus software or firewall and then try it again. 3. Wiring the Power Inputs The Upper Panel of the Industrial Managed PoE+ Switch indicates a DC - 5 - PLANET Technology Corp.2024©...
  • Page 6 Please follow the steps below to insert the power wire. Insert positive/negative DC power wires into contacts 1 and 2 for Power 1 or 5 and 6 for Power 2. Figure 3-1: IGS-4215-4P4T/IGS-4215-4P4T2S/IGS-4215-8P2T2S DC Inlet Power Socket - 6 -...
  • Page 7 Quick Installation Guide Figure 3-2: IGS-4215-4UP4T2S/IGS-4215-8UP2T2S DC Inlet Power Socket Figure 3-3: IGS-4215-16P2T2S DC Inlet Power Socket - 7 - PLANET Technology Corp.2024©...
  • Page 8 The wire gauge for the terminal block should be in the range from 12 to 24 AWG. Please check the wire AWG Ampere specification before connecting PLANET Industrial Managed PoE+ Switch. PWR1 and PWR2 must provide exactly the same DC...
  • Page 9 Quick Installation Guide 3.1 Grounding the Device Users MUST complete grounding wired with the device; otherwise, a sudden lightning could cause fatal damage to the device. Figure 3-5: Grounding Method (applies to all models) - 9 - PLANET Technology Corp.2024©...
  • Page 10: Terminal Setup

    A terminal program is required to make the software connection to the Industrial Managed PoE+ Switch. Run terminal program on the OS. When the following screen appears, make sure that the COM port should be configured as: - 10 - PLANET Technology Corp.2024©...
  • Page 11 Quick Installation Guide  Baud: 115200  Data bits: 8  Parity: None  Stop bits: 1  Flow control: None Figure 4-2: COM Port Configuration - 11 - PLANET Technology Corp.2024©...
  • Page 12 Figure 4-1 appears. The following console screen is based on the firmware version before February of 2024. User Name: admin Password: admin Figure 4-3: Industrial Managed PoE+ Switch Console Login Screen - 12 - PLANET Technology Corp.2024©...
  • Page 13 MAC ID. Figure: MAC ID Label Enter the default username and password, then set a new password according to the rule-based prompt and confirm it. - 13 - PLANET Technology Corp.2024©...
  • Page 14 Figure 4-3: Industrial Managed PoE+ Switch Console Login Screen The user can now enter commands to manage the Industrial Managed PoE+ Switch. For a detailed description of the commands, please refer to the following chapters. - 14 - PLANET Technology Corp.2024©...
  • Page 15  Show the current IP address At the “IGS-4215-8P2T2S#” prompt, enter “show ip”. The screen displays the current IP address, subnet mask and gateway as shown in Figure 4-4. Figure 4-4: IP Information Screen - 15 - PLANET Technology Corp.2024©...
  • Page 16 If the IP is successfully configured, the Industrial Managed PoE+ Switch will apply the new IP address setting immediately. You can access the Web interface of the Industrial Managed PoE+ Switch through the new IP address. - 16 - PLANET Technology Corp.2024©...
  • Page 17 Figure 4-6. Figure 4-6: The Configuration Save Screen* If you are not familiar with console command or the related parameter, enter “?” anytime in console to get the help Note: description. - 17 - PLANET Technology Corp.2024©...
  • Page 18: Starting Web Management

    Switch is 192.168.0.100, then the manager PC should be set to 192.168.0.x (where x is a number between 1 and 254, except 100), and the default subnet mask is 255.255.255.0. Figure 5-1: IP Management Diagram - 18 - PLANET Technology Corp.2024©...
  • Page 19 February of 2024. When the following dialog box appears, please enter the default user name and password “admin”. The login screen in Figure 5-2 appears. Default Username: admin Default Password: admin Figure 5-2: Web Login Screen - 19 - PLANET Technology Corp.2024©...
  • Page 20 5. Find the MAC ID on your device label. The default password is "sw" or “mc” followed by the last six lowercase characters of the MAC ID. Figure 5-3: Industrial Managed Switch MAC ID Label - 20 - PLANET Technology Corp.2024©...
  • Page 21 6. Enter the default username and password, then set a new password according to the rule-based prompt and confirm it. Upon success, press any key to return to the login prompt. Log in with "admin" and the “new password” to access the Web interface. - 21 - PLANET Technology Corp.2024©...
  • Page 22 Figure 5-6: Web Main Screen of Industrial Managed PoE+ Switch The Switch Menu on the left of the Web page lets you access all the commands and statistics the Industrial Managed PoE+ Switch provides. Figure 5-7: Switch Menu Figure 5-8: Switch Sub-menu - 22 - PLANET Technology Corp.2024©...
  • Page 23 Quick Installation Guide Figure 5-9: Switch Sub-menu Now, you can use the Web management interface to continue the Switch management. Please refer to the user’s manual for more. - 23 - PLANET Technology Corp.2024©...
  • Page 24 Click the Save icon on the top Switch Menu bar. Press the “Apply” button to save running configuration to start up configuration. - 24 - PLANET Technology Corp.2024©...
  • Page 25: Recovering Back To Default Configuration

    10 seconds. After the device is rebooted, you can log in the management Web interface within the same subnet of 192.168.0.xx. Figure 6-1: IGS-4215 PoE Series Reset Button - 25 - PLANET Technology Corp.2024©...
  • Page 26 Quick Installation Guide Figure 6-2: IGS-4215-16P2T2S Reset Button - 26 - PLANET Technology Corp.2024©...
  • Page 27: Customer Support

    7. Customer Support Thank you for purchasing PLANET products. You can browse our online FAQ resource and User’s Manual on PLANET Web site first to check if it could solve your issue. If you need more support information, please contact PLANET switch support team.

Table of Contents