Wiring - Ablerex ARES PLUS-ECO 1K User Manual

100/110/120/125v online ups 1-3 kva
Hide thumbs Also See for ARES PLUS-ECO 1K:
Table of Contents

Advertisement

less humidity and dust are required for safe and reliable operation of the UPS.
Always keep 200 mm of free space behind the UPS rear panel.
Check that the indications on the name plate located on the top cover of the UPS meets to
the AC-power source and the true electrical consumption of the total load

3.3 Wiring

NOTE:
Do not apply power to the UPS until installation is totally completed.
Do not make unauthorized changes to the UPS; otherwise, damage may occur to your
equipment and void your warranty.
3.3.1 Input Wiring
Ares Plus Eco 1, 2, 3 kVA (100V/110V120/125V) comes with input cable with plug. Plug the
input cable to appropriate mains supply socket.
Note the voltage and current rating of the product. Refer to below table for input wiring
Nominal Input
Model
1K
2K
3K
Even internal over current protection breaker is embedded in the product, external switchable
circuit breaker should be installed at upstream of the UPS product for safe installation and
maintenance of product.
Installation of product with Power cord with plug end
Rated Input
Voltage
10/10/9.6/9.3A
100/110/120/
16/16/16/16A
125Vac
24/24/24/24A
AWG/Cross-section
Current
Standard cable with
15
Input Cable
Area
plug
Terminal Block
Tightening
Torque
NA

Advertisement

Table of Contents
loading

Table of Contents