Troubleshooting - Paradyne 3172 Operator's Manual

Zhone acculink 3172 dsu-csu combo: user guide
Hide thumbs Also See for 3172:
Table of Contents

Advertisement

Troubleshooting

AT&T Paradyne's E1 DSU/CSU is designed to provide
you with many years of trouble-free service. However,
Table 4-6 gives you some direction if a problem occurs.
Symptom
No power
1. The power cord is not securely plugged into
the wall receptacle or rear panel connector.
2. The wall receptacle has no power.
Power-Up
The E1 DSU/CSU has detected an internal
Self-Test fails
hardware failure.
Message LOS at
1. Network cable problem.
Net appears
2. No signal is being transmitted at the far-end
E1 DSU/CSU.
3. E1 facility problem.
4. The 120 ohm interface is being used and the
RX SHIELD switch is in the EARTH position.
Message LOS at
1. DTE Drop/Insert cable problem.
DTE appears
2. No signal being transmitted from the DTE.
Message OOF at
1. Incompatible framing format between the
Net appears
network and the E1 DSU/CSU.
2. Network cabling problem.
3. E1 facility problem.
Message OOF at
1. Incompatible framing format between the
DTE appears
Drop/Insert port on the customer premises
equipment and the E1 DSU/CSU.
2. DTE Drop/Insert cabling problem.
Message
1. Network cable problem.
RAI at Net
2. Far-end E1 DSU/CSU DTE has detected an
appears
LOS, LOF, AIS, or EER condition.
3. E1 facility problem.
Message
DTE has detected an LOS, LOF, AIS, or EER
RAI at DTE
condition.
appears
Message
1. Upstream E1 DSU/CSU is transmitting an AIS.
AIS at Net
2. The network is transmitting an AIS.
appears
3170-A2-GB20-10
For problems other than those listed in the table, please
contact your AT&T Paradyne service representative.
Table 4-6
(1 of 2)
Troubleshooting
Possible Cause
March 1996
Solutions
1. Check that the power cord is securely
attached at both ends.
2. Check the wall receptacle power by plugging
in some equipment that is known to be
working.
Contact your AT&T Paradyne field service
representative.
1. Check that the network cable is securely
attached at both ends.
2. Check the far-end E1 DSU/CSU status.
3. Contact your E1 facility provider.
4. Change the RX SHIELD switch to the OPEN
position when using the 120 ohm interface.
1. Check that the DTE Drop/Insert cable is
securely attached at both ends.
2. Check the DTE status.
1. Check that the framing format for the network
interface is correct.
2. Check that the network cable is securely
attached at both ends.
3. Contact your E1 facility provider.
1. Check that the framing format for the DTE
Drop/Insert interface is correct.
2. Check that the DTE Drop/Insert cable is
securely attached at both ends.
1. Check that your network cable is securely
attached at both ends.
2. Check the status of the far-end device.
3. Contact your E1 facility provider.
1. Check the status of the DTE.
2. Check that the DTE Drop/Insert cable is
securely attached at both ends.
1. Check the status of the upstream E1
DSU/CSU(s).
2. Contact your E1 facility provider.
Maintenance
4-11

Advertisement

Table of Contents
loading

This manual is also suitable for:

3174317 e1 series

Table of Contents