DS-KD8003 Series Module Door Station User Manual
2. Remove the plastic sheet of the cable entry.
3. Mark the gang box screw holes on the wall.
1) Route the cables through the gang box hole.
2) Insert the gang box into the installation hole.
3) Mark the gang box screw holes' position with a marker, and take out the gang box.
4. Drill 4 holes according to marks on the wall, and insert the expansion sleeves into the screw
holes.
Figure 4-8 Drill Installation Hole
Figure 4-9 Mark the Screw Holes
26