InfiniScale® IV 8-Port QSFP 40 Gb/s InfiniBand Switch User Manual
3.
Place four caged nuts into the rack at the U level you want to install the switch.
4.
While supporting the switch, catch and tighten the four bolts into the caged nuts.
5.
Ground the switch.
6.
Plug in the power cord.
7.
You can start connecting all of the cables to the switch.

5.2.3 Installation Procedure for a Side by Side Installation

Installation kit parts for a side by side installation:
• 1 Two switch metal frame
• 4 switch mounted rails
• 24 flat head screws
The installation kits come with enough switch mounted rails and flat head screws to install two
switches.
Figure 9: Connect the Mounting Brackets
• Two rail slides
• 8 pairs of caged nuts and bolts
• 1 blank cover
Mellanox Technologies
Rev 1.4
25