www.ti.com
Designator
Quantity Description
Y1
1
C37
0
C62, C63, C64
0
C104
0
J19, J20
0
R6, R12, R20, R53,
0
R54, R55, R56, R57
R10
0
R19, R21, R41
0
R58
0
R61, R63, R66, R68,
0
R74
R80, R82
0
SNVU851 – NOVEMBER 2023
Submit Document Feedback
Table 6-1. Bill of Materials (continued)
Crystal, 25 MHz, 20 ppm, AEC-Q200 Grade 1,
SMD
CAP, CERM, 10 uF, 10 V, +/- 10%, X7R, 0805 GCM21BR71A106KE22L
Chip Multilayer Ceramic Capacitors for
Automotive
CAP, CERM, 1000 pF, 50 V, +/- 10%, X7R,
0603
Receptacle, 2.5 mm, 3x2, Gold, SMT
RES, 0, 5%, 0.063 W, AEC-Q200 Grade 0,
0402
RES, 20.0 k, 1%, 0.1 W, AEC-Q200 Grade 0,
0603
RES, 100 k, 1%, 0.1 W, 0603
RES, 4.7 k, 5%, 0.1 W, AEC-Q200 Grade 0,
0603
RES, 10 k, 5%, 0.063 W, AEC-Q200 Grade 0,
0402
RES, 1.00 k, 1%, 0.1 W, 0603
Copyright © 2023 Texas Instruments Incorporated
Schematics, Layout and BOM
Part Number
ECS-250-12-33Q-JES-TR
GCM188D70J106ME36D
C0603C102K5RACTU
6651712-1
CRCW04020000Z0ED
CRCW060320K0FKEA
RC0603FR-07100KL
CRCW06034K70JNEA
CRCW040210K0JNED
RC0603FR-071KL
LP87725Q1EVM Evaluation Module
Manufacturer
ECS Inc.
MuRata
Murata
Kemet
TE Connectivity
Vishay-Dale
Vishay-Dale
Yageo
Vishay-Dale
Vishay-Dale
Yageo
19
Need help?
Do you have a question about the LP87725Q1EVM and is the answer not in the manual?