9.3. Terminal requirements for the AC connection

To ensure a correct connection, the terminals for M12 must meet the dimensional requirements below.
L1
L2
L3
PE
N*

9.4. AC connection process

INFO
The unit is equipped with different cable entry systems to facilitate the installation with any cable section
chosen by the installer.
1.
Access the AC compartment on the side of the inverter.
30
u ≤ 39 mm
13 ≤ v ≤ 15.5 mm
j = k + 2 mm
j
≥44
w ≤ 22 mm
j = k + 3 (mm)
x ≥ 13 mm
j
ACL2014IQM01_ - Installation and Operation Manual
AC connection
v
u
w
x
k
k