Ingeteam INGECON SUN 110TL M9 Installation And Operation Manual page 31

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 4
AC connection
2.
Connect the three phases, neutral and ground to the terminals marked L1, L2, L3, N and PE, respecting
the polarities. The torque for the terminals is 25 Nm.
CAUTION
If connecting the unit to a TN-C network, connect the three phases to the L1, L2, L3 terminals and the PEN
wire to the PE terminal. Connect a cable with a cross-section of 12 mm
terminal in order to have a neutral intake.
3.
Close the cover of the AC compartment, checking that the lower membrane is correctly fitted.
ACL2014IQM01_ - Installation and Operation Manual
PE
N
L1
L2
L3
or more from the PE terminal to the N
2
Ingeteam
EN
ES
FR
IT
PT
31

Advertisement

Table of Contents
loading

Table of Contents