Download Print this page

HP 4277A Operation And Service Manual page 39

Lcz meter

Advertisement

Model 4277A
SECTION II
Option
Kit
Part Number
Parts Included
Part Number
Remarks
907
Handle Kit
Front Handle
d)
5060-9900
n
5061-0090
Trim Strip
0
5020-8897
X8-32
X
3/8 Screw
2510-0195
Hi
9.525mm
908
Rack Flange Kit
Rack Mount Flange
0
5020-8863
n
5061-0078
X8-32
X
3/8 Screw
2510-0193
9.525mm
909
Rack Flange &
Front handle
0
5060-9900
2
Handle Kit
Rack Mount Flange
0
5020-8875
2
5061-0084
X8-32
X
3/8 Screw
2510-0194
8
15.875mm
Remove adhesive-backed trim strips 0
from
side at
right
and
left
front
of
instrument.
HANDLE INSTALLATION : Attach front
handle ® to sides at right and left front
of instrument with screws provided and
attach trim
@
to handle.
RACK
MOUNTING : Attach rack mount
flange (2) to sides at right and left front of
instrument with screws provided.
HANDLE
AND
RACK
MOUNTING
:
Attach front handle ® and rack
mount
flange ® together to sides at right and
left
front
of
instrument
with
screws
provided.
When rack
mounting (3 and 4 above),
remove all four feet (lift bar at inner side
of foot, and slide foot toward the bar).
Figure 2-3. Rack Mount Kit.
11. Connect the pull-up resistor and external
voltage source as shown in Figure 2-6 (a).
Note
A
+5V
is
recommended
but
higher voltage can be used as
long
as
the
current
through
A1T5
and
A1Q4
does
not
exceed 25mA.

Advertisement

loading