GE SF6 Instruction Manual page 71

With spring operating mechanisms
Table of Contents

Advertisement

Preparing the breaking chambers
Removing the
chamber casing
Rotating
the chambers
11- 2016
Installation
Coupling of column and chambers
Remove the side panels and cover from the case.
Using two flexible slings, swing the chambers through 180 then level the
transport covers.
NOTE:
Turn the breaking chamber casing (2) so that the face
with the two 'humps' is facing the lifting equipment.
GE Information
2
L31- 7137EN/02
3/18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gl317Fk3- 4

Table of Contents