Preparing the breaking chambers
Removing the
chamber casing
Rotating
the chambers
11- 2016
Installation
Coupling of column and chambers
Remove the side panels and cover from the case.
Using two flexible slings, swing the chambers through 180 then level the
transport covers.
NOTE:
Turn the breaking chamber casing (2) so that the face
with the two 'humps' is facing the lifting equipment.
GE Information
2
L31- 7137EN/02
3/18