Linking the densimeter on the control tool
Process
08- 2016
Maintenance
Electrical contact densimeter threshold inspection
The table below gives the process to link the densimeter on the control
tool:
Step
Action
1
Check
that
"REGULATION"
(20) - of the gauge (11) -
is in "valve closed" posi-
tion (screwed).
2
Connect the pipe (12) of
the gauge (11) on the
valve (24) of the connec-
tion valve block (5).
3
Briefly open the SF
bottle tap (21) and the
cock (22) of the pressure
reducer to eliminate any
air inside the pipe (23)
(approx. 20 s at low
flow- rate).
Connect the pipe (23) on
the valve (10) of the
gauge (11).
GE Information
Diagram
the
11
screw
12
11
gas
6
21
SF
6
20
5
24
12
11
10
23
22
L51- 108EN/06
3/8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gl317Fk3- 4

Table of Contents