GE SF6 Instruction Manual page 140

With spring operating mechanisms
Table of Contents

Advertisement

Confirm the pressure
Process
07- 2016
Installation
Filling with SF
The table below gives the confirmation operation steps of the filling pressure
with SF
gas :
6
Step
1
Disconnect the tube (10) - of the
pressure reducer - from the filling
tool (2).
NOTE : Keep
unconnected end of the tube
(10) higher than the other end,
to stop the SF
contains from escaping and to
prevent moisture entering.
2
S Connect the tube (15) - of the
gauge 0- 1 MPa (14) - to the
filling tool (2).
S When the required pressure is
confirmed, remove the gauge
(14) and and store it away from
humidity.
3
Remove the filling tool (2) and
refit the plug (17) (4 daN.m)
GE Information
gas
6
Action
the
gas which it
6
14
Comment/Diagram
2
10
2
15
17
2
L32- 007EN/07
4/8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gl317Fk3- 4

Table of Contents