Pre- filling with SF
Process
02- 2017
Installation
Pre- filling with SF
gas
6
The table below gives the steps of the pre- filling with SF
Step
1
Remove the valve cap (5) of the
filling tool (4).
2
D Open the SF
D Open and close the cock (11) of
the pressure reducer to eliminate
any air inside the tube (12)
(approx. 3 s at low flow- rate).
D Close the SF
3
Connect the tube (12) to the filling
tool (4).
4
Open the SF
and adjust gas output by acting on
the cock (11) of the pressure
reducer (reduced flow rate).
D Close the tap (9) from time to
time to check pressure on the
gauge (13).
D Start filling again until the
required pressure about 0.05 MPa
is reached.
D Close in this order : the tap (9),
then the cock (11).
GE Information
gas at 0.05 MPa
6
Action
gas bottle tap (9).
6
gas bottle tap (9).
6
SF
gas bottle tap (9)
6
SF
END OF PROCEDURE
gas operation :
6
Comment/Diagram
4
5
9
12
Open
6
Closed
11
4
12
9
Open
13
Closed
6
11