Finish and test operations
Finish
Test operations
DUE TO THE RISK OF PROBLEMS DURING TRANSPORT,
BEFORE ANY INITIAL FILLING & COMMISSIONING OPERATIONS,
THE CONDITION OF THE INSULATORS MUST BE VERIFIED VISUALLY.
ALL PERSONS PRESENT MUST TAKE SHELTER OR REMAIN AT
FOR COMPOSITES: THE HEIGHT OF THE DEVICE.
NOTE : It should be noted that the filler gas used must conform to IEC 60376.
10- 2016
Commissioning
Pre- commissioning inspections
Check the general appearance of the apparatus and touch up paint if neces-
sary before commissioning.
S The connection of auxiliary circuits is sufficiently advanced to allow remote
controls to be used.
S Perform 5 CLOSING - OPENING cycles electrically, by remote control.
AFTER MAINTENANCE OR INTERVENTIONS,
A MINIMUM SAFETY DISTANCE.
FOR CERAMIC DEVICES: APPROXIMATELY 50m