GE SF6 Instruction Manual page 101

With spring operating mechanisms
Table of Contents

Advertisement

Installing stress- shields
Necessary
Grid Solutions
components
Necessary product
Process
03- 2017
Installation
Installing stress- shields on the interrupting chambers
List of the Grid Solutions components necessary for the assembling (per
pole) :
Mark
Diagram
(5)
LOCTITE 262 (screws locking)
Install the stress- shields (1) at each end of the interrupting chambers (4)
using the screws (5).
NOTE : Lock the screws (5) with "LOCTITE 262".
1
5
H M12- 30
5 daN.m
GE Information
Designation
Screws
H M12-30
4
4
1
x 4
Number
8
1
L31- 7510EN/02
3/4