Installation
Coupling of column and chambers
Before coupling the chambers and column, check that the markings on the
breaking chambers correspond with those on the column
The final chamber/column coupling operations should be completed in a
time of  40 min.
NOTE:
The coupling operations must be carried out by a minimum
of two people.
T(max)  40 min
Provide an adequate means of
hoisting:
3,000 daN (minimum).
An aerial basket is mandatory.
The chamber- column coupling operation can be broken down into a num-
ber of stages:
Step
A
Preparing the column's corona shield
Preparing the elements required for the coupling opera-
B
tion
C
Hoisting and preparing the breaking chamber
Final coupling
D
GE Information
H + 2 m
H
Subject
Page
2
3
5
6

L31- 7138EN/02