Coolant Circuit Assembly; Electric Component Assembly - Kohler KDI 1903M Workshop Manual

Hide thumbs Also See for KDI 1903M:
Table of Contents

Advertisement

9

9.13 Coolant circuit assembly

9.13.1 Thermostatic valve
Important
Always replace the gasket A after each assembly.
1. Check the condition of the seal gasket A and fit it on
the thermostatic valve B.
2. Position the thermostatic valve B in the seat on the
head C (detail D).
3. Secure the cover E with the screws F on the head C
(tightening torque of 10 Nm).
9.13.2 Coolant pump
Important
Always replace the gasket L every time it is
assembled.
1. Fit the pump G with the screws H interposing the
gasket L (tightening torque of 25 Nm).

9.14 Electric component assembly

9.14.1 Sensors and switches
9.14.1.1 Coolant temperature sensor
1. Secure the sensor D onto the head E (tightening
torque of 20 Nm).
EN
134
ASSEMBLY INFORMATION
Fig 9.81
Fig 9.82
Fig 9.83

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kdi 2504m

Table of Contents