Assignment List View Inputs / Control Outputs - Meiko FV 28 G-M Operating Instructions Manual

Table of Contents

Advertisement

Operating instructions EcoStar 545 D-M
17.5 Assignment list
View inputs / control outputs
Indication
Left
Right
dIn
1
0/1
dIn
2
0/1
dIn
3
0/1
dIn
4
0/1
dIn
7
0/1
dIn
9
0/1
dIn
10
0/1
dIn
12
0/1
AIn
1
83°C
AIn
2
60°C
out
1.1
0/1
out
1.2
0/1
out
1.3
0/1
out
2.1
0/1
out
2.2
0/1
out
2.3
0/1
out
3.1
0/1
out
3.2
0/1
out
3.3
0/1
out
3.4
0/1
out
3.5
0/1
Leak water switch condition:
Datei:BA_EcoStar545D-M_9662798_EN_2009-05.doc
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
Input / output / other
Hood closed
Boiler level
Tank level
Hood start
Hall-sensor ADT (option)
Level rinse aid (option)
Level detergents (optin)
Measure conductance VE (optional)
Boiler temperature
Tank temperature
Wash pump
Booster Pump
Drain pump
Rinse aid – dosage pump
Detergent – dosage pump
Tank heating
Filling valve
Soft starter valve
Boiler heating
Operation indicator
EW valve
Leak water switch must not have operated.
W e reserv e the right to change execution and construction!
Conditions
none
none
none
none
none
none
none
none
none
none
No leak water
No leak water
No leak water
No leak water
No leak water
No leak water
No leak water
No leak water
No leak water
No leak water
No leak water
34/44
9662798

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents