Pytes E-Box Series User Manual page 37

Hide thumbs Also See for E-Box Series:
Table of Contents

Advertisement

Step 1 Connect the PE cable to each battery Ground point, and tight the screw, as
shown below:
Step 2 Connect the other terminal to a reliable external ground point.
Connecting Battery Power Cable
In this chapter, we are using Victron Fuse holder, 150A Fuse, 250A Busbar as example, installer can choose proper device
according to local regulation.
Step 1 Connecting Fuse and Fuse holder.
Install Fuse holders for Positive cable and Negative cable on a reliable surface.
Connect Battery positive power cable with fuse and install on Fuse holder, tighten
the screw. It is recommended to use 150A fuse for each battery.
Connect Battery negative power cable with fuse and install on Fuse holder, tighten
the screw. It is recommended to use 150A fuse for each battery.
Repeat for other batteries.
Shanghai Pytes Energy Co., Ltd

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the E-Box Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

E-box 48100r

Table of Contents